Skip to main content
English
English
Polski
+48 (22) 448 92 00
Service Menu
News
Events
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro stone and concrete columns
Wet soil mixing
Controlled Stiffness Columns CSC®
Vibro compaction
Dynamic compaction
Dynamic replacement
Rapid impact compaction (RIC)
Wick / PVDs / band drains
Mass mixing
Deep foundations
Soil displacement piles SDP and VDP
CFA piles (auger cast)
Micropiles
Driven precast piles
Bored piles / drilled shafts
Driven cast in-situ piles
Grouting
Jet grouting (Soilcrete®)
Compaction grouting
Cavity/bulk/mine fill grouting
Compensation/fracture grouting
Injection systems
Earth retention
Diaphragm walls/barrettes
Secant pile walls
Contiguous pile walls
Sheet piles
Soil nails
Anchors - single bond length
Slurry cut-off walls
Marine
Wharf construction
Jetty construction
Bridge construction
Flood shafts construction
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Heavy foundations
Re-levelling structures
Monitoring
Underpinning
Containment
Excavation support
Marine structures
Remediation
Seepage control
Stabilisation
Mine stabilisation/void filling
Tunnelling
Slope stabilisation
Markets
Industrial
Commercial
Infrastructure
Power
Institutional/public
Residential
Design and build
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Quality
Sustainability
About us
Our history
Our leadership
About Keller Group
KELLER Foundation
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Jetty construction
Technique
Jetty construction Keller has the experience and expertise to construct long jetties into deep water to allow the berthing of large vessels without the need for any dredging. Keller rig on a barge…
/en/expertise/techniques/jetty-construction
Wharf construction
Technique
Wharf construction Keller has the engineering capacity to design flexible and tailored wharf construction solutions to meet different soil conditions and requirements. Keller crane constructing a new…
/en/expertise/techniques/wharf-construction
Soil displacement piles SDP and VDP
Technique
Soil displacement piles SDP and VDP Screw displacement piles (SDP) and Vibro displacement piles (VDP) are a fast and effective technology for deep, pile foundations for various structures.…
/en/expertise/techniques/soil-displacement-piles-sdp-and-vdp
Controlled Stiffness Columns CSC®
Technique
Controlled Stiffness Columns CSC® This method involves strengthening the ground using high deformation modulus CSC® (Controlled Stiffness Column) concrete displacement columns. Controlled Stiffness…
/en/expertise/techniques/controlled-stiffness-columns-csc
Injection systems
Technique
Injection systems Injection systems involve the injection of aqueous solutions into the ground to treat expansive, collapsible, and desiccated clay and railroad subgrade mud pockets. Injection…
/en/expertise/techniques/injection-systems
Flood shafts construction
Technique
Flood shafts construction Keller designs seal of all types of flood shafts, including structures already in operation and newly designed. Floodbank construction Common uses Flood shaft seals Repair…
/en/expertise/techniques/flood-shafts-construction
West Branch- Poznań Office
Office
West Branch- Poznań Office West Branch Poznań T: +48 (0) 61 655 69 30 +48616556930 F:
[email protected]
www.keller.com.pl ul. Innowatorów 8 Street Dąbrowa k. Poznania 62-070 Dopiewo Key contacts…
/en/contact-us/poznan
Head Office- Center Branch, Diaphragm Walls Branch
Office
Head Office- Center Branch, Diaphragm Walls Branch Head Office Ożarów Mazowiecki T: +48 (0) 22 448 92 00 +48224489200 F: +48 (0) 22 448 92 05 +48224489205
[email protected]
www.keller.com.pl…
/en/contact-us/warsaw
North Branch - Gdańsk Office, Technical Office, Hydrotechnical section
Office
North Branch - Gdańsk Office, Technical Office, Hydrotechnical section North Branch Gdańsk T: +48 (0) 58 769 75 40 +48587697540 F:
[email protected]
www.keller.com.pl 11 Azymutalna Street 80-298…
/en/contact-us/gdansk
West Branch- Wrocław office
Office
West Branch- Wrocław office West Branch Wrocław T: +48 (0) 71 756 42 50 +48717564250 F:
[email protected]
www.keller.com.pl 2-6 Długosza Street 51-162 Wrocław Key contacts Sławomir Szczepaniak,…
/en/contact-us/wroclaw
North Branch- Szczecin Office
Office
North Branch- Szczecin Office North Branch Szczecin T: +48 (0) 695 030 364 +48723440174 F:
[email protected]
www.keller.com.pl 17 Jerzego Janosika street 71-424 Szczecin Key contacts Lech…
/en/contact-us/szczecin
South Branch
Office
South Branch South Branch Kraków T: +48 (0) 12 341 87 00 +48123418700 F:
[email protected]
www.keller.com.pl 25J Marcika Street 30-443 Kraków Key contacts Łukasz Dziadoń, South Branch Director E:…
/en/contact-us/krakow
Railway embankment on the E65 railway line.
Project
Railway embankment on the E65 railway line. Thanks to the protection of the active landslide and the strengthening of the ground and the railway embankment, which was completed in the record time of…
/en/projects/railway-embankment-e65-railway-line
DCT2 Terminal North Port
Project
DCT2 Terminal North Port As part of the extension of the container terminal, a crane beam had to be piled up on stilts and the ground had to be reinforced on an area of about 20 ha for storage yards…
/en/projects/dct2-terminal-north-port
LOTOS Refinery EFRA U&O Programme
Project
LOTOS Refinery EFRA U&O Programme The EFRA U&O project required designing and execution of comprehensive geotechnical works alongside with the necessary preparatory, excavation and…
/en/projects/lotos-refinery-efra-uo-programme
E65 railway line substructure reinforcement
Project
E65 railway line substructure reinforcement On the 1 km section of the E65 railway line in the Szymankow area, where there were numerous deformations of the tracks in the past, Keller reinforced the…
/en/projects/e65-railway-line-substructure-reinforcement
LOTOS Refinery 10+ Programme
Project
LOTOS Refinery 10+ Programme The largest European petrochemical investment, the LOTOS Refinery's 10+ Programme, required the design and execution of geotechnical works for several dozen new…
/en/projects/lotos-refinery-10-programme
DCT Container Terminal North Port
Project
DCT Container Terminal North Port In order to improve access to the existing DCT container terminal, the ground under the modernized access track and under the foundation of the new crane had to be…
/en/projects/dct-container-terminal-north-port
Granaria - buildings in Quarter II on Granary Island
Project
Granaria - buildings in Quarter II on Granary Island In the prestigious, historic centre of Gdańsk on Granary Island, it was necessary to perform a comprehensive excavations support, underpinning…
/en/projects/granaria-buildings-quarter-ii-granary-island
Sea Towers
Project
Sea Towers The Sea Towers residential building, located in the city centre, directly at the President's Quay, consists of 2 towers with 28 and 36 storeys. The higher tower together with the…
/en/projects/sea-towers
Pagination
Previous page
‹‹
Page 3
Next page
››